Client
Associated British Ports
Value
£2,000,000
Duration
24 weeks
D&B Partner
WF Brown and Associates
New facility at Hamilton Dock for Crew Transfer Vessels.
Supporting the development of the East Anglia ONE offshore wind farm project throughout its construction, operation and maintenance. East Anglia ONE features 102 wind turbines situated 43km off the Suffolk coast.
Design and construction of a new pontoon facility at the Port of Lowestoft. Works included the removal of the existing pontoons and mooring infrastructure which was located alongside the new berths.
Once removed we carried out the installation of four new pontoons, which were prefabricated off-site, that could provide berthing for up to four Crew Transfer Vessels at any one time. The structure was made up of two pontoons which formed the main spine of the jetty, and two finger pontoons attached to the spine.
Additionally, quayside works included service diversions, surfacing, the installation of a substation and fuel tank, and a low-level retaining wall alongside an existing storage area.